Project outputs

PD Output 1

Girls and boys under five and women have increased access to nutrition services, including early detection, counseling, and treatment of severe acute malnutrition during the emergency

Activity codeActivityTargetAchieved BamaAchieved RannComment
Activity 1Mass MUAC screening1,1004,48919,922Follow up screening conducted.
Activity 2Provision of SAM treatment without medical complications150133257Treatment ongoing with new admissions and discharge
Activity 3Provision of SAM treatment with medical complications1000Registration for Stabilization not completed within the project period.
Activity 4Distribution of MNP to children 6-23 months20000Pipeline breakage of the commodity
Activity 5Promotion of appropriate maternal, infant and young child nutrition services for children 0-23 months and pregnant and lactating women90193221More groups are being formed
Activity 6Provision of Vitamin A supplement, deworming and prophylaxis to children aged 6-59 months90130257Completed

PD Output 2

The affected population have immediate and increased access to Water, Sanitation and Hygiene services within 48 hours and beyond the activation of the Humanitarian Programme Document (HPD

Activity codeActivityTargetAchieved BamaAchieved RannComments
Activity 2.1Initial Rapid Assessment22NACompleted
Activity 2.2aProvision of safe drinking water through water trucking to 2000 affected populations @15l/p/d (30cu/day)20002,000NAOver 2,000HHs got access to water through water trucking
Activity 2.2bProvision of safe drinking water through repairs/rehabilitation/extension reticulation network of existing water point (SPBH)15NADue to absence of SPBH 5 HPBH were rehabilitated
Activity 2.2cProvision of safe drinking water through repairs/rehabilitation water point (1 HPBH)11NACompleted
Activity 2.3aDistribution of WASH NFIs350350NACompleted
Activity 2.3cProcure WASH NFIs (cholera)150150NACompleted
Activity 2.4aProvide safe sanitation access to the displaced population through the rehabilitation of 8 existing facilities88NACompleted
Activity 2. 4bProvide safe sanitation access to the displaced population through the construction of 40 new emergency latrines4040NACompleted

 